Calendula Touch of Red Yellow(1000S.S.)

Calendula Touch of Red Yellow(1000S.S.)

635.00

CALENDULA TOUCH OF RED SERIES :– THIS TALL SERIES HAS UNIQUE FLOWER PETAL COLORATION WHERE EACH PETAL IS TIPPED WITH RED.

HT:-45CMS

Out of stock

SKU: DS-415 Category: Brand:

Calendula officinalis

Touch of Red Yellow

  • Excellent home garden bedding and cut flower plant
Crop Time: Spring: 9 – 10 weeks
Height: 24 ″ / 60 cm
Exposure: Sun
Seed Form: Raw Seed
Best Uses: Bedding, Cutflower

Culture guide

Usage

Cut flower, border and mixed container

Sowing method

1-3 seeds per plug

Germination

5-10 days at 70 °F (21 °C), cover seed lightly with vermiculite after sowing.

Growing on

Transplant plugs after 2-3 weeks. Grow on at 50-55 °F (10-13 °C). Calendulas are cool weather plants that are best produced for spring or early fall sales.

Media

Use a well-drained, growing substrate with 10-30 % clay, 0-15 % parts (e.g. bark, sand, perlite), 1-1,5 kg /m³, complete balanced fertilizer. Iron-chelate, micronutrients, pH 5.8-6.5. Field: humus, loamy soils with good drainage and good nutrition levels, Standard fertilization: 50-80 g/m² slow release fertilizer.

Fertilization

High fertilization levels are required. Fertilize the crop weekly with 100-200 ppm nitrogen (at 2 kg/m³ slow release fertilizer in substrate), using a complete balanced fertilizer. Avoid high ammonium and high nitrogen levels. High nitrogen levels cause delay in flower initiation and smooth stems. Prevent magnesium deficiency by applying magnesium sulphate (0,025%) 1-2 times and in case of iron deficiency apply Fe-Chelate for 1-2 times. Field: begin two weeks after transplanting with fertilization (see above).


Stage I Starts with the radicle breaking through the testa. The roots are touching the medium. Ends with fully developed cotyledons.
Stage II Starts from fully developed cotyledons. Ends with the fully developed true leaf or true leaf pair.
Stage III Starts from the fully developed true leaf or true leaf pair and ends with 80% of the young plants being marketable.
Stage IV All young plants are ready for sale and in the process of being hardened off. This stage lasts about 7 days.

The cultural recommendations are based on results from trials conducted under Central European conditions. Different conditions in other parts of the world may lead to deviations in results achieved.

Shopping cart0
There are no products in the cart!
Continue shopping
0